










The structure of the office building of 8500 m2 has a large overhang to consist of metal-truss located in the southwest corner, which side are made of urban development. Three of the lattice girders are located along the walls inside the building and rely on a girder that takes the efforts of a pre-stressed concrete structure based directly on the bedrock to ten meters deep.